Wind Power Plus Battery Energy Storage System in Germany
A techno-economic study of a 25 MW co-located wind + battery energy storage system (BESS) project, evaluated across five forward price scenarios for the German power market (2027–2056).
Jointly produced by phelas and Fluence. Combining Fluence's expertise in grid-scale battery energy storage systems (BESS) with phelas's techno-economic project modelling to evaluate co-located wind + storage at the project level.
01 · Executive Summary
Adding a battery energy storage system transforms the wind business case.
The five things to know
01A BESS diversifies the revenue stack.
Wind alone earns from one price curve. The battery energy storage system brings in three additional revenue streams — day-ahead arbitrage, intraday, and aFRR positive capacity — which dilutes exposure to any single market and stabilises cash flow.
02Wind alone barely clears the cost of capital.
Standalone wind delivers IRR between 7.5% and 12.5% — and lands within 100 bp of the 8% hurdle in three of five scenarios. With the right-sized BESS, the co-located project earns IRR between 8.5% and 13.9% — every scenario clears the 8% hurdle and four of five deliver IRR ≥ 9%.
03BESS and wind operate complementarily.
The BESS generates 26%–51% of total project revenue from just 17%–29% of the CapEx. It absorbs energy when wind cannibalises its own price and releases it when the market values it most, while also reducing exposure to redispatch costs.
04Well-utilised, right-sized systems beat oversized ones.
Across all scenarios the NPV-maximising BESS is well utilised at 15–25 MW — 2 hours in four of five scenarios, extending to 6 hours only in the most heavily cannibalised (disorderly) scenario. Capital efficiency is the driver: a 2 h system already captures the full daily peak-to-trough spread where almost all arbitrage value sits.
05Minimising curtailment is the wrong target.
Sizing the BESS to eliminate curtailment destroys €18M–€29M of NPV. To avoid curtailing the last surplus MWh, the system would have to charge defensively at low-value hours, sacrificing higher-value arbitrage and aFRR cycles. The economic optimum is reached well before all curtailment is removed.
Baseline vs. Enhanced
5-scenario comparison
IRR Range
Risk Exposure
Scenarios within 100 bp of WACC
Revenue Diversification
Wind · BESS DA · Intraday · aFRR Cap+
Methodology at a glance
Discount rate
8% WACC
real, post-tax, 2% CPI
Project horizon
30 years
2027–2056; BESS re-CapEx after 20 yr
BESS CapEx
≈150–225 €/kWh
total installed, duration-dependent
Price basis
Synthetic
weather-year 2024 benchmark
NPV and IRR are 30-year project figures at 8% WACC including 2% CPI. Modelled scenarios are stress tests based on synthetic price data, not forecasts, and do not constitute investment advice. Full assumptions, interactive charts, and the complete methodology are available after registration below.